01 May 2010

ADA Bathroom Remodel

http://valonportfolio.blogspot.com/2010/05/ada-bathroom-remodel.html
AutoCAD drawing of the new design




Spring 2010 (Built)

A gentleman with MS needed an updated bathroom.



Kaye came to me when it was time for her to update her husbands bathroom.  He had severe heath problems by this time, limiting his mobility to virtually none.  She had a lot of ideas on what the new bathroom should have in it and what to do with the old one.  We worked together, incorporating her ideas as well as my own.  I drew up the plan for her and she took it to her builder who made a couple of adjustments, and built her a bathroom that made much more sense for her husband's needs.

Client: Kaye Simpson

AutoCAD drawing of the bathroom before